| Executive Summary |
| |
| 1 Introduction |
| |
| 1.1 Purpose and Scope of Study | 1-1 |
| 1.2 WTC Site | 1-2 |
| 1.3 Timeline and Event Summary | 1-4 |
| 1.4 Response of the Engineering Community | 1-8 |
| 1.4.1 Local Authorities | 1-8 |
| 1.4.2 SEAoNY Participation | 1-10 |
| 1.5 Overview of Building Codes and Fire Standards | 1-15 |
| 1.5.1 Building Codes | 1-15 |
| 1.5.2 Unusual Building Loads | 1-16 |
| 1.5.3 Overview of Fire-Structure Interaction | 1-17 |
| 1.5.3.1 ASTM E119 Standard Fire Test | 1-18 |
| 1.5.3.2 Performance in Actual Building Fires | 1-18 |
| 1.6 Report Organization | 1-20 |
| 1.7 References | 1-21 |
|
| |
| 2 WTC 1 and WTC 2 |
| |
| 2.1 Building Descriptions | 2-1 |
| 2.1.1 General | 2-1 |
| 2.1.2 Structural Description | 2-1 |
| 2.1.3 Fire Protection | 2-11 |
| 2.1.3.1 Passive Protection | 2-12 |
| 2.1.3.2 Suppression | 2-12 |
| 2.1.3.3 Smoke Management | 2-13 |
| 2.1.3.4 Fire Department Features | 2-13 |
| 2.1.4 Emergency Egress | 2-13 |
| 2.1.5 Emergency Power | 2-14 |
| 2.1.6 Management Procedures | 2-14 |
| 2.2 Building Response | 2-15 |
| 2.2.1 WTC 1 | 2-15 |
| 2.2.1.1 Initial Damage From Aircraft Impact | 2-15 |
| 2.2.1.2 Fire Development | 2-21 |
| 2.2.1.3 Evacuation | 2-24 |
| 2.2.1.4 Structural Response to Fire Loading | 2-24 |
| 2.2.1.5 Progression of Collapse | 2-27 |
| 2.2.2 WTC 2 | 2-27 |
| 2.2.2.1 Initial Damage From Aircraft Impact | 2-27 |
| 2.2.2.2 Preliminary Structural Analysis | 2-32 |
| 2.2.2.3 Fire Development | 2-34 |
| 2.2.2.4 Evacuation | 2-35 |
| 2.2.2.5 Initiation of Collapse | 2-35 |
| 2.2.2.6 Progression of Collapse | 2-35 |
| 2.2.3 Substructure | 2-35 |
| 2.3 Observations and Findings | 2-36 |
| 2.4 Recommendations | 2-39 |
| 2.5 References | 2-40 |
|
| |
| 3 WTC 3 |
| |
| 3.1 Design and Construction Features | 3-1 |
| 3.1.1 Project Overview | 3-1 |
| 3.1.2 Building Description | 3-1 |
| 3.1.3 Structural Description | 3-2 |
| 3.2 1993 Attack | 3-5 |
| 3.3 2001 Attacks | 3-5 |
| 3.3.1 Fire and Evacuation | 3-5 |
| 3.3.2 Building Response | 3-6 |
| 3.4 Observations | 3-8 |
| 3.5 Recommendations | 3-8 |
| 3.6 References | 3-8 |
|
| |
| 4 WTC 4, 5, and 6 |
| |
| 4.1 Design and Construction Features | 4-1 |
| 4.1.1 Structural Design Features | 4-1 |
| 4.1.2 Fire Protection Features | 4-2 |
| 4.2 Building Loads and Performance | 4-4 |
| 4.2.1 Impact Damage to WTC 5 | 4-7 |
| 4.2.2 Fire Damage | 4-9 |
| 4.3 Analysis of Building Performance | 4-10 |
| 4.3.1 Steel and Frame Behavior | 4-10 |
| 4.3.2 WTC 5 - Local Collapse Mechanisms | 4-15 |
| 4.4 Observations and Findings | 4-16 |
| 4.5 Recommendations | 4-21 |
| 4.6 References | 4-21 |
|
| |
| 5 WTC 7 |
| |
| 5.1 Introduction | 5-1 |
| 5.2 Structural Description | 5-3 |
| 5.2.1 Foundations | 5-3 |
| 5.2.2 Structural Framing | 5-4 |
| 5.2.3 Transfer Trusses and Girders | 5-4 |
| 5.2.4 Connections | 5-8 |
| 5.3 Fire Protection Systems | 5-10 |
| 5.3.1 Egress Systems | 5-10 |
| 5.3.2 Detection and Alarm | 5-10 |
| 5.3.3 Compartmentalization | 5-11 |
| 5.3.4 Suppression Systems | 5-12 |
| 5.3.5 Power | 5-13 |
| 5.4 Building Loads | 5-13 |
| 5.5 Timeline of Events Affecting WTC 7 on September 11, 2001 | 5-16 |
| 5.5.1 Collapse of WTC 2 | 5-16 |
| 5.5.2 Collapse of WTC 1 | 5-16 |
| 5.5.3 Fires at WTC 7 | 5-20 |
| 5.5.4 Sequence of WTC 7 Collapse | 5-23 |
| 5.6 Potential Collapse Mechanism | 5-24 |
| 5.6.1 Probable Collapse Initiation Events | 5-24 |
| 5.6.2 Probable Collapse Sequence | 5-30 |
| 5.7 Observations and Findings | 5-31 |
| 5.8 Recommendations | 5-32 |
| 5.9 References | 5-32 |
|
| |
| 6 Bankers Trust Building |
| |
| 6.1 Introduction | 6-1 |
| 6.2 Building Description | 6-1 |
| 6.3 Structural Damage Description | 6-4 |
| 6.4 Architectural Damage Description | 6-6 |
| 6.5 Fireproofing | 6-10 |
| 6.6 Overall Assessment | 6-10 |
| 6.7 Analysis | 6-11 |
| 6.7.1 Key Assumptions | 6-12 |
| 6.7.2 Model Refinement | 6-12 |
| 6.7.3 Simulation of Nonlinear Behavior | 6-13 |
| 6.7.4 Connection Details | 6-13 |
| 6.7.5 Connection Behavior | 6-14 |
| 6.8 Observations and Findings | 6-15 |
| 6.9 Recommendations | 6-16 |
| 6.10 References | 6-16 |
|
| |
| 7 Peripheral Buildings |
| |
| 7.1 Introduction | 7-1 |
| 7.2 World Financial Center | 7-4 |
| 7.2.1 The Winter Garden | 7-4 |
| 7.2.2 WFC 3, American Express Building | 7-5 |
| 7.3 Verizon Building | 7-7 |
| 7.4 30 West Broadway | 7-13 |
| 7.5 130 Cedar Street | 7-14 |
| 7.6 90 West Street | 7-15 |
| 7.7 45 Park Place | 7-17 |
| 7.8 One Liberty Plaza | 7-17 |
| 7.9 Observations and Findings | 7-19 |
| 7.10 Recommendations | 7-19 |
| 7.11 References | 7-19 |
|
| |
| 8 Observations, Findings, and Recommendations |
| |
| 8.1 Summary of Report Observations, Findings, and Recommendations | 8-1 |
| 8.2 Chapter Observations, Findings, and Recommendations | 8-2 |
| 8.2.1 Chapter 1: Building Codes and Fire Standards | 8-2 |
| 8.2.2 Chapter 2: WTC 1 and WTC 2 | 8-2 |
| 8.2.2.1 Observations and Findings | 8-2 |
| 8.2.2.2 Recommendations | 8-5 |
| 8.2.3 Chapter 3: WTC 3 | 8-6 |
| 8.2.3.1 Observations | 8-6 |
| 8.2.3.2 Recommendations | 8-6 |
| 8.2.4 Chapter 4: WTC 4, 5, and 6 | 8-6 |
| 8.2.4.1 Observations and Findings | 8-6 |
| 8.2.4.2 Recommendations | 8-7 |
| 8.2.5 Chapter 5: WTC 7 | 8-7 |
| 8.2.5.1 Observations and Findings | 8-7 |
| 8.2.5.2 Recommendations | 8-8 |
| 8.2.6 Chapter 6: Bankers Trust | 8-8 |
| 8.2.6.1 Observations and Findings | 8-8 |
| 8.2.6.2 Recommendations | 8-9 |
| 8.2.7 Chapter 7: Peripheral Buildings | 8-10 |
| 8.2.7.1 Observations and Findings | 8-10 |
| 8.2.7.2 Recommendations | 8-10 |
| 8.2.8 Appendix C: Limited Metallurgical Examination | 8-10 |
| 8.2.8.1 Observations and Findings | 8-10 |
| 8.2.8.2 Recommendations | 8-11 |
| 8.3 Building Performance Study Recommendations for Future Study | 8-11 |
| 8.3.1 National Response | 8-11 |
| 8.3.2 Interaction of Structural Elements and Fire | 8-11 |
| 8.3.3 Interaction of Professions in Design | 8-12 |
| 8.3.4 Fire Protection Engineering Discipline | 8-12 |
| 8.3.5 Building Evacuation | 8-12 |
| 8.3.6 Emergency Personnel | 8-12 |
| 8.3.7 Education of Stake-holders | 8-13 |
| 8.3.8 Study Process | 8-13 |
| 8.3.9 Archival Information | 8-13 |
| 8.3.10 SEAoNY Structural Engineering Emergency Response Plan | 8-13 |
|
| |
| A Overview of Fire Protection in Buildings |
| |
| A.1 Introduction | A-1 |
| A.2 Fire Behavior | A-1 |
| A.2.1 Burning Behavior of Materials | A-1 |
| A.2.2 Stages of Fire Development | A-4 |
| A.2.3 Behavior of Fully Developed Fires | A-4 |
| A.3 Structural Response to Fire | A-5 |
| A.3.1 Effect of Fire on Steel | A-5 |
| A.3.1.1 Introduction | A-5 |
| A.3.1.2 Evaluating Fire Resistance | A-6 |
| A.3.1.3 Response of High-rise, Steel-frame Buildings in Previous Fires | A-9 |
| A.3.1.4 Properties of Steel | A-10 |
| A.3.1.5 Fire Protection Techniques for Steel | A-14 |
| A.3.1.6 Temperature Rise in Steel | A-14 |
| A.3.1.7 Factors Affecting Performance of Steel Structures in Fire | A-17 |
| A.3.2 Effect of Fire on Concrete | A-19 |
| A.3.2.1 General | A-19 |
| A.3.2.2 Properties of Lightweight Concrete | A-19 |
| A.3.3 Fire and Structural Modeling | A-22 |
| A.4 Life Safety | A-23 |
| A.4.1 Evacuation Process | A-24 |
| A.4.2 Analysis | A-24 |
| A.5 References | A-26 |
|
| |
| B Structural Steel and Steel Connections |
| |
| B.1 Structural Steel | B-1 |
| B.2 Mechanical Properties | B-2 |
| B.3 WTC 1 and WTC 2 Connection Capacity | B-4 |
| B.3.1 Background | B-4 |
| B.3.2 Observations | B-5 |
| B.3.3 Connectors | B-5 |
| B.4 Examples of WTC 1 and WTC 2 Connection Capacity | B-7 |
| B.4.1 Bolted Column End Plates | B-7 |
| B.4.2 Bolted Spandrel Connections | B-8 |
| B.4.3 Floor Truss Seated End Connections at Spandrel Beam and Core | B-9 |
| B.4.4 WTC 5 Column-tree Shear Connections | B-12 |
| B.5 References | B-14 |
|
| |
| C Limited Metallurgical Examination |
| |
| C.1 Introduction | C-1 |
| C.2 Sample 1 (From WTC 7) | C-1 |
| C.3 Summary for Sample 1 | C-5 |
| C.4 Sample 2 (From WTC 1 or WTC 2) | C-5 |
| C.5 Summary for Sample 2 | C-13 |
| C.6 Suggestions for Future Research | C-13 |
|
| |
| D WTC Steel Data Collection |
| |
| D.1 Introduction | D-1 |
| D.2 Project Background | D-1 |
| D.3 Methods | D-2 |
| D.3.1 Identifying and Saving Pieces | D-2 |
| D.3.2 Documenting Pieces | D-5 |
| D.3.3 Getting Coupons | D-8 |
| D.4 Data Collected | D-10 |
| D.5 Conclusions and Future Work | D-13 |
| D.6 References | D-13 |
|
| |
| E Aircraft Information |
| |
| General Specifications | E-1 |
|
| |
| F Structural Engineers Emergency Response Plan |
| |
| G Acknowledgments |
| |
| H Acronyms and Abbreviations |
| |
| I Metric Conversions |
| |
| Tables |
| |
| Table 1.1 Timeline of Major Events. | 1-10 |
| Table 2.1 Estimated Openings in Exterior Walls of WTC 1. | 2-23 |
| Table 5.1 WTC 7 Tenants | 5-2 |
| Table 5.2 WTC 7 Fuel Distribution Systems. | 5-14 |
| Table 7.1 DoB/SEAoNY Cooperative Building Damage Assessment. | 7-3 |
| Table A.1 Peak Heat Release Rates of Various Materials. | A-3 |
| Table A.2 Fire Duration in Previous Fire Incidents in Steel-frame Buildings. | A-10 |
| Table A.3 Critical Temperatures for Various Types of Steel. | A-15 |
| Table A.4 Test Methods for Spray-applied Fireproofing Materials. | A-18 |
|
| |
| Figures |
| |
| Chapter 1 |
| |
| Figure 1-1 WTC site map. | 1-3 |
| Figure 1-2 Approximate flight paths of aircraft. | 1-5 |
| Figure 1-3 WTC impact locations and resulting fireballs. | 1-5 |
| Figure 1-4 Areas of aircraft debris impact. | 1-6 |
| Figure 1-5 Fireball erupts on the north face of WTC 2. | 1-7 |
| Figure 1-6 View of the north and east faces. | 1-7 |
| Figure 1-7 Schematic depiction of areas of collapse debris impact. | 1-9 |
| Figure 1-8 Seismic recordings at Palisades. | 1-11 |
| Figure 1-9A Satellite photograph of the WTC site taken before the attacks. | 1-12 |
| Figure 1-9B Satellite photograph of the WTC site taken after the attacks. | 1-13 |
| Figure 1-10 Comparison of high-rise building and aircraft sizes. | 1-19 |
|
| |
| Chapter 2 |
| |
| Figure 2-1 Representative floor plan (based on 94th and 95th floors of WTC 1). | 2-2 |
| Figure 2-2 Representative structural framing plan, upper floors. | 2-4 |
| Figure 2-3 Partial elevation of exterior bearing-wall frame. | 2-6 |
| Figure 2-4 Base of exterior wall frame. | 2-7 |
| Figure 2-5 Structural tube frame behavior. | 2-7 |
| Figure 2-6 Floor truss member with detail of end connection. | 2-8 |
| Figure 2-7 Erection of exterior wall and floor deck components. | 2-9 |
| Figure 2-8 Erection of floor framing during original construction. | 2-9 |
| Figure 2-9 Cross-section through typical floor trusses, showing transverse truss. | 2-9 |
| Figure 2-10 Outrigger truss system at tower roof. | 2-10 |
| Figure 2-11 Location of subterranean structure. | 2-11 |
| Figure 2-12 Floor plan of 94th and 95th floors of WTC 1. | 2-14 |
| Figure 2-13 Zone of aircraft impact on the north face of WTC 1. | 2-16 |
| Figure 2-14 Zone of impact of aircraft on the north face of WTC 1. | 2-17 |
| Figure 2-15 Impact damage to the north face of WTC 1. | 2-18 |
| Figure 2-16 Impact damage to exterior columns on the north face of WTC 1. | 2-18 |
| Figure 2-17 Debris location on the 91st floor of WTC 1. | 2-19 |
| Figure 2-18 Landing gear found at the corner of West and Rector Streets. | 2-19 |
| Figure 2-19 Redistribution of load after aircraft impact. | 2-20 |
| Figure 2-20 Expansion of floor slabs and framing forces out columns. | 2-25 |
| Figure 2-21 Buckling of columns initiated by failure of floor joist connections. | 2-26 |
| Figure 2-22 Catenary action of floor joists initiates column buckling failures. | 2-26 |
| Figure 2-23 Aerial photograph of the WTC site after September 11 attack. | 2-28 |
| Figure 2-24 Southeast corner of WTC 2 shortly after aircraft impact. | 2-28 |
| Figure 2-25 Zone of impact of aircraft on the south face of WTC 2. | 2-29 |
| Figure 2-26 Impact damage to the south face of WTC 2. | 2-30 |
| Figure 2-27 Impact damage to exterior columns on the south face of WTC 2. | 2-30 |
| Figure 2-28 Conflagration and debris exiting the north wall of WTC 2. | 2-31 |
| Figure 2-29 A portion of the fuselage of United Airlines Flight 175. | 2-32 |
| Figure 2-30 North face of WTC 2. | 2-33 |
| Figure 2-31 Plot of column utilization ratio at the 80th floor of WTC 2. | 2-34 |
| Figure 2-32 The top portion of WTC 2 falls to the east, then south. | 2-36 |
| Figure 2-33 Damage to substructure slabs caused by collapses. | 2-36 |
|
| |
| Chapter 3 |
| |
| Figure 3-1 Developed north and west elevations. | 3-2 |
| Figure 3-2 Developed south and east elevations. | 3-2 |
| Figure 3-3 Typical hotel floor plan. | 3-3 |
| Figure 3-4 Typical hotel floor framing plan. | 3-4 |
| Figure 3-5 Typical transverse bracing elevation. | 3-5 |
| Figure 3-6 Exterior columns from WTC 2 fall on WTC 3. | 3-6 |
| Figure 3-7 Partial collapse of WTC 3 after collapse of WTC 2. | 3-7 |
| Figure 3-8 Remains of WTC 3 after collapse of WTC 1 and WTC 2. | 3-8 |
|
| |
| Chapter 4 |
| |
|
|
| |
| Chapter 5 |
| |
| Figure 5-1 Foundation plan - WTC 7. | 5-3 |
| Figure 5-2 Plan view of typical floor framing. | 5-4 |
| Figure 5-3 Elevations of building and core area. | 5-5 |
| Figure 5-4 Fifth floor diaphragm plan showing T-sections. | 5-6 |
| Figure 5-5 3-D diagram showing relations of trusses and transfer girders. | 5-6 |
| Figure 5-6 Seventh floor plan showing locations of transfer trusses and girders. | 5-7 |
| Figure 5-7 Truss 1 detail. | 5-8 |
| Figure 5-8 Truss 2 detail. | 5-9 |
| Figure 5-9 Truss 3 detail. | 5-10 |
| Figure 5-10 Cantilever transfer girder detail. | 5-11 |
| Figure 5-11 Compartmentalization provided by concrete floor slabs. | 5-12 |
| Figure 5-12 Sequence of debris generated by collapses of WTC 2, 1, and 7. | 5-17 |
| Figure 5-13 Pedestrian bridge. | 5-18 |
| Figure 5-14 Spread of debris around WTC 7. | 5-18 |
| Figure 5-15 Debris from the collapse of WTC 1. | 5-19 |
| Figure 5-16 Damage to the southeast corner of WTC 7. | 5-19 |
| Figure 5-17 Building damage to the southwest corner of WTC 7. | 5-20 |
| Figure 5-18 WTC 7, with a large volume of dark smoke rising from it. | 5-21 |
| Figure 5-19 Fires on the 11th and 12th floors of the east face of WTC 7. | 5-22 |
| Figure 5-20 View of WTC 7 with both mechanical penthouses intact. | 5-24 |
| Figure 5-21 East mechanical penthouse collapsed. | 5-25 |
| Figure 5-22 East and now west mechanical penthouses gone. | 5-25 |
| Figure 5-23 View from the north of the "kink" or fault developing in WTC 7. | 5-26 |
| Figure 5-24 Areas of potential transfer truss failure. | 5-27 |
| Figure 5-25 Debris cloud from collapse of WTC 7. | 5-27 |
| Figure 5-26 Debris generated after collapse of WTC 7. | 5-28 |
|
| |
| Chapter 6 |
| |
| Figure 6-1 Bankers Trust building with impact damage. | 6-1 |
| Figure 6-2 Closeup of area of partial collapse. | 6-2 |
| Figure 6-3 Floor plan above the 2nd level (ground floor extension not shown). | 6-3 |
| Figure 6-4 Area of initial impact of debris at the 23rd floor. ..... | 6-4 |
| Figure 6-5 Approximate zones of damage. | 6-5 |
| Figure 6-6 Moment-connected beams to columns. | 6-7 |
| Figure 6-7 Column with the remains of two moment connections. | 6-7 |
| Figure 6-8 Failed shear connection of beam web to column web. | 6-8 |
| Figure 6-9 Suspended column D-8 at the 15th floor. | 6-8 |
| Figure 6-10 Area of collapsed floor slab. | 6-9 |
| Figure 6-11 Bankers Trust lobby (note debris has been swept into piles). | 6-9 |
| Figure 6-12 Office at north side of the 8th floor. | 6-10 |
| Figure 6-13 3-D ANSYS model of flange and shear plate moment connection. | 6-14 |
| Figure 6-14 3-D ANSYS model of flange and seat moment connection. | 6-14 |
|
| |
| Chapter 7 |
| |
| Figure 7-1 NYC DDC/DoB Cooperative Building Damage Assessment Map. | 7-2 |
| Figure 7-2 Southeast corner of WFC 3. | 7-5 |
| Figure 7-3 View of Winter Garden damage from West Street. | 7-6 |
| Figure 7-4 View of Winter Garden damage from West Street. | 7-6 |
| Figure 7-5 Interior damage at floor 20 of WFC 3. | 7-7 |
| Figure 7-6 Verizon building - damage to east elevation. | 7-8 |
| Figure 7-7 Verizon building - damage to east elevation. | 7-9 |
| Figure 7-8 Verizon building - damage to east elevation. | 7-9 |
| Figure 7-9 Verizon building - column damage on east elevation. | 7-10 |
| Figure 7-10 Verizon building - damage to south elevation. | 7-11 |
| Figure 7-11 Verizon building - localized damage to south elevation. | 7-11 |
| Figure 7-12 Verizon building - detail of damage to south elevation. | 7-12 |
| Figure 7-13 30 West Broadway - south facade, 6th floor to roof. | 7-13 |
| Figure 7-14 130 Cedar Street and 90 West Street. | 7-14 |
| Figure 7-15 Interior of 90 West Street showing typical construction features. | 7-16 |
| Figure 7-16 Buckling damage at top of column on floor 8 of 90 West Street. | 7-17 |
| Figure 7-17 Buckling damage at top of column on floor 23 of 90 West Street. | 7-18 |
| Figure 7-18 One Liberty Plaza - south elevation, lower floors. | 7-19 |
| Figure 7-19 One Liberty Plaza - south elevation, upper floors. | 7-20 |
|
| |
| Appendix A |
| |
| Figure A-1 Heat release rate for office module. | A-2 |
| Figure A-2 Fire growth rates. | A-3 |
| Figure A-3 Comparison of exposure temperatures in standard tests. | A-6 |
| Figure A-4 Thermal properties of steel at elevated temperatures. | A-11 |
| Figure A-5 Stress-strain curves for structural steel (ASTM A36). | A-11 |
| Figure A-6 Strength of steel at elevated temperatures. | A-12 |
| Figure A-7 Modulus of elasticity at elevated temperatures for structural steels. | A-13 |
| Figure A-8 Reduction of the yield strength of cold-formed light-gauge steel. | A-13 |
| Figure A-9 Steel temperature rise for unprotected steel column. | A-16 |
| Figure A-10 Effect of one inch of spray-applied fire-proofing. | A-16 |
| Figure A-11 The modulus of elasticity strength of different types of concretes. | A-20 |
| Figure A-12 Compressive strength of concrete at elevated temperature. | A-21 |
| Figure A-13 Variation of the volume-specific heat of concretes. | A-21 |
| Figure A-14 Specific flow rate as a function of density. | A-25 |
| Figure A-15 Estimated evacuation times for high-rise buildings. | A-26 |
|
| |
| Appendix B |
| |
| Figure B-1 Exterior column end plates. | B-1 |
| Figure B-2 Tensile stress-strain curves for three ASTM-designation steels. | B-3 |
| Figure B-3 Expanded yield portion of the tensile stress-strain curves. | B-3 |
| Figure B-4 Effect of high strain rate on shape of stress-strain diagram. | B-4 |
| Figure B-5 Column tree showing bolt bearing shear failures. | B-6 |
| Figure B-6 Shear fracture failure of fillet welds. | B-7 |
| Figure B-7 Bent and fractured bolts at a column four-bolt connection. | B-8 |
| Figure B-8 Typical truss top chord connections. | B-10 |
| Figure B-9 (A) Visco-elastic damper angles. | B-11 |
| Figure B-9 (B) failed bearing seat connection. | B-11 |
| Figure B-10 (A) Bracket plate. | B-11 |
| Figure B-10 (B) horizontal plate brace with shear connectors. | B-11 |
| Figure B-11 Shear failure of floor joist connections. | B-12 |
|
| |
| Appendix C |
| |
| Figure C-1 Eroded A36 wide-flange beam. | C-1 |
| Figure C-2 Closeup view of eroded wide-flange beam section. | C-2 |
| Figure C-3 Section from the wide-flange beam shown in Figure C-1. | C-2 |
| Figure C-4 Optical microstructure near the steel surface. | C-3 |
| Figure C-5 Another hot corrosion region near the steel surface. | C-3 |
| Figure C-6 Microstructure of A36 steel. | C-4 |
| Figure C-7 Deep penetration of liquid into the steel. | C-4 |
| Figure C-8 Qualitative chemical analysis. | C-5 |
| Figure C-9 Qualitative chemical analysis. | C-6 |
| Figure C-10 Grain boundary corrosion attack. | C-6 |
| Figure C-11 Region showing the corrosion attack of Sample 2. | C-7 |
| Figure C-12 Higher magnification of the region shown in Figure C-10. | C-7 |
| Figure C-13 Regions where chemical analysis was performed. | C-8 |
| Figure C-14 Gradient of sulfides into the steel from the oxide-metal interface. | C-12 |
|
| |
| Appendix D |
| |
| Figure D-1 Mixed, unsorted steel upon delivery to salvage yard. | D-2 |
| Figure D-2 Torch cutting of very large pieces. | D-3 |
| Figure D-3 Pile of unsorted mixed steel. | D-3 |
| Figure D-4 Engineer inspects and marks promising pieces. | D-4 |
| Figure D-5 Stenciled markings on WTC 2 perimeter column from floors 68-71. | D-5 |
| Figure D-6 Steel pieces marked "SAVE." | D-6 |
| Figure D-7 Engineers measuring and recording steel piece dimensions. | D-6 |
| Figure D-8 Engineer measuring spandrel plate thickness (ts). | D-7 |
| Figure D-9 Measurement of 1/4 inch for web thickness (tw). | D-7 |
| Figure D-10 Measured dimensions of the steel pieces. | D-8 |
| Figure D-11 Burnt steel piece marked for cutting of coupon. | D-9 |
| Figure D-12 Coupon cut from WTC 5 showing web tear-out at bolts. | D-9 |
| Figure D-13 WTC 1 or WTC 2 core column (C-74). | D-10 |
| Figure D-14 WTC 7 W14 column tree with beams attached to two floors. | D-11 |
| Figure D-15 Built-up member with failure along stitch welding. | D-11 |
| Figure D-16 Engineer inspecting fire damage of perimeter column tree. | D-12 |
| Figure D-17 Seat-connected in fire-damaged W14 column from WTC 7. | D-12 |
| Figure D-18 WTC 1 or WTC 2 floor-truss section with seat connection. | D-13 |
|