Destruction of Evidence

The primary evidence of the 3 largest structural failures in history -- the structural steel -- was removed and destroyed as quickly as possible.

  • The city accepted a plan by Controlled Demolition Inc. for the recycling of the steel, 11 days after the attack.
  • The steel was sold to scrap metal vendors for a low price.
  • The vast majority of the steel was quickly removed to ships destined for blast furnaces in India and China.
  • New infrastructure was built to accelerate the removal.
  • Trucks hauling the steel were outfitted with $1000 GPS locators.
  • Investigators were barred from Ground Zero.
  • People were threatened with arrest for taking photographs.
  • The evidence destruction operation was conducted over the concerted objections of victims' family members and the firefighting community.